
Highways · Aberdare, Wales
Managing Hexavalent Chromium on the Afon Cynon Bridge
Stripping and repainting 900 m² of bridge steelwork coated in Cr(VI) paint using RPR induction removal, full decontamination and on-site testing, with no measurable operative exposure.
Read Case Study

