Corrosion Management group:
Case Studies

Case Studies

A selection of recent projects showing how cleaning, access, inspection and maintenance come together on site.

Afon Cynon Bridge wrapped in a sealed white enclosure for Cr(VI) paint removal

Highways · Aberdare, Wales

Managing Hexavalent Chromium on the Afon Cynon Bridge

Stripping and repainting 900 m² of bridge steelwork coated in Cr(VI) paint using RPR induction removal, full decontamination and on-site testing, with no measurable operative exposure.

Read Case Study
Operative in a powered respirator and harness at the box girder access hatch above the M62, with a rescue tripod set up

Highways · Huddersfield, West Yorkshire

Confined Space Corrosion Survey: M62 Red Lane Dyke

Corrosion, coating and ultrasonic thickness survey inside a 120 m steel box girder over the M62, including removal of 2.4 tonnes of corrosion and lead paint controls.

Read Case Study
Large raw water storage tank at the Uniper site with scaffold access

Power generation

EEMUA 159 Out-of-Service Inspection: Uniper Raw Water Tank

First EEMUA 159 inspection of a 6.6 million litre fire water tank during a short outage, with repairs to keep it compliant and in service until its 2027 reline.

Read Case Study
Inspector walking through a rock tunnel beside the corroded Dulyn Reservoir pipeline

Water · Snowdonia, Wales

Underground Pipeline NDT Survey: Dulyn Reservoir

Corrosion survey and ultrasonic thickness testing of a 140 m pipeline and valve house up to 15 m underground, in an NC4 confined space with complex access.

Read Case Study

Talk to Us About Your Assets

Tell us about the structure, tank or pipeline and what needs doing. We will put together a scope that covers cleaning, access, inspection and maintenance.

Get in Touch